Projects with award advantage

Midachter Bridge

Contracting authority: province of Gelderland

Location: bridge in the A348 over tributary of the river IJssel in the municipality of De Steeg, street under the bridge is Havikerwaard.

We participated in the tender as a subcontractor to Bokalis on February 27, 2020. They scored this work based on their plan of action (PVA) where the criterion is the most circular approach as an objective money.

These works were completed on 05-12-2021.

Black-and-white photograph of a concrete bridge over a road.

John Frost Bridge Arnhem

Location: Rijkwater Street
In conjunction with Mobilis

CO2 reduction review John Frost Bridge, data and targets.

On the John Frost bridge, we deployed electric compressors. We get the green power from our partner Mobilis.

Yellow mobile air compressor, electric speed control.

Table of contents

Recent blog posts

Iris Facility Solutions has partnered with the Standard Liège footballclub to provide maintenance and cleaning services for the Stade de Sclessin

link

Iris Group opens new chapter with the support of Belgian family group Soudal

link

The CO2 Performance Ladder: the sustainability tool to reduce our CO2 footprint.

link

CHIREC awarded the “Nature Network” label: an exemplary collaboration with Iris Landscaping

link
link

Laura wins 'Mobility Project of the Year' at Link2Fleet Belgium: great recognition for Iris Group's mobility strategy

link
Iris logo
Résumé de la politique de confidentialité

Ce site utilise des cookies afin que nous puissions vous fournir la meilleure expérience utilisateur possible. Les informations sur les cookies sont stockées dans votre navigateur et remplissent des fonctions telles que vous reconnaître lorsque vous revenez sur notre site Web et aider notre équipe à comprendre les sections du site que vous trouvez les plus intéressantes et utiles.