{"id":2306,"date":"2022-12-22T13:22:07","date_gmt":"2022-12-22T12:22:07","guid":{"rendered":"https:\/\/iris.instawp.co\/?p=2306"},"modified":"2025-01-28T15:18:24","modified_gmt":"2025-01-28T14:18:24","slug":"projects-with-award-advantage","status":"publish","type":"post","link":"https:\/\/www.iris.be\/en\/actualiteit\/blog\/projecten-met-gunningsvoordeel\/","title":{"rendered":"Projects with award advantage"},"content":{"rendered":"<h2 class=\"wp-block-heading\">Midachter Bridge<\/h2>\n\n\n\n<p class=\"wp-block-paragraph\">Contracting authority: province of Gelderland<\/p>\n\n\n\n<p class=\"wp-block-paragraph\"><em>Location: bridge in the A348 over tributary of the river IJssel in the municipality of De Steeg, street under the bridge is Havikerwaard.<\/em><\/p>\n\n\n\n<p class=\"wp-block-paragraph\"><strong>We participated in the tender as a subcontractor to Bokalis on February 27, 2020.<\/strong>&nbsp;They scored this work based on their plan of action (PVA) where the criterion is the most circular approach as an objective money.<\/p>\n\n\n\n<p class=\"wp-block-paragraph\"><strong>These works were completed on 05-12-2021.<\/strong><\/p>\n\n\n\n<div class=\"wp-block-columns is-layout-flex wp-container-core-columns-is-layout-7387b849 wp-block-columns-is-layout-flex\">\n<div class=\"wp-block-column is-layout-flow wp-block-column-is-layout-flow\" style=\"flex-basis:100%\">\n<figure class=\"wp-block-gallery has-nested-images columns-default is-cropped wp-block-gallery-1 is-layout-flex wp-block-gallery-is-layout-flex\">\n<figure class=\"wp-block-image size-large\"><img fetchpriority=\"high\" decoding=\"async\" width=\"1024\" height=\"320\" data-id=\"2307\" src=\"https:\/\/www.iris.be\/wp-content\/uploads\/2025\/01\/Ontwerp-zonder-titel-79-1024x320.png\" alt=\"Table shows CO2 reduction by Vapor Blasting method.\" class=\"wp-image-2307\" srcset=\"https:\/\/www.iris.be\/wp-content\/uploads\/2025\/01\/Ontwerp-zonder-titel-79-1024x320.png 1024w, https:\/\/www.iris.be\/wp-content\/uploads\/2025\/01\/Ontwerp-zonder-titel-79-500x156.png 500w, https:\/\/www.iris.be\/wp-content\/uploads\/2025\/01\/Ontwerp-zonder-titel-79-768x240.png 768w, https:\/\/www.iris.be\/wp-content\/uploads\/2025\/01\/Ontwerp-zonder-titel-79-1536x480.png 1536w, https:\/\/www.iris.be\/wp-content\/uploads\/2025\/01\/Ontwerp-zonder-titel-79.png 1600w\" sizes=\"(max-width: 1024px) 100vw, 1024px\" \/><\/figure>\n<\/figure>\n<\/div>\n<\/div>\n\n\n\n<figure class=\"wp-block-image aligncenter size-large\"><img decoding=\"async\" width=\"427\" height=\"327\" src=\"https:\/\/www.iris.be\/wp-content\/uploads\/2025\/01\/Picture3-1.png\" alt=\"Black-and-white photograph of a concrete bridge over a road.\" class=\"wp-image-2312\"\/><\/figure>\n\n\n\n<h2 class=\"wp-block-heading\">John Frost Bridge Arnhem<\/h2>\n\n\n\n<p class=\"wp-block-paragraph\">Location: Rijkwater Street<br>In conjunction with Mobilis<\/p>\n\n\n\n<figure class=\"wp-block-image size-large\"><img decoding=\"async\" width=\"1024\" height=\"267\" src=\"https:\/\/www.iris.be\/wp-content\/uploads\/2025\/01\/Ontwerp-zonder-titel-78-1024x267.png\" alt=\"CO2 reduction review John Frost Bridge, data and targets.\" class=\"wp-image-2319\" srcset=\"https:\/\/www.iris.be\/wp-content\/uploads\/2025\/01\/Ontwerp-zonder-titel-78-1024x267.png 1024w, https:\/\/www.iris.be\/wp-content\/uploads\/2025\/01\/Ontwerp-zonder-titel-78-500x130.png 500w, https:\/\/www.iris.be\/wp-content\/uploads\/2025\/01\/Ontwerp-zonder-titel-78-768x200.png 768w, https:\/\/www.iris.be\/wp-content\/uploads\/2025\/01\/Ontwerp-zonder-titel-78-1536x400.png 1536w, https:\/\/www.iris.be\/wp-content\/uploads\/2025\/01\/Ontwerp-zonder-titel-78.png 1920w\" sizes=\"(max-width: 1024px) 100vw, 1024px\" \/><\/figure>\n\n\n\n<p class=\"wp-block-paragraph\">On the John Frost bridge, we deployed electric compressors. We get the green power from our partner Mobilis.<\/p>\n\n\n\n<figure class=\"wp-block-image aligncenter size-full\"><img loading=\"lazy\" decoding=\"async\" width=\"539\" height=\"605\" src=\"https:\/\/www.iris.be\/wp-content\/uploads\/2025\/01\/Picture5.png\" alt=\"Yellow mobile air compressor, electric speed control.\" class=\"wp-image-2320\" srcset=\"https:\/\/www.iris.be\/wp-content\/uploads\/2025\/01\/Picture5.png 539w, https:\/\/www.iris.be\/wp-content\/uploads\/2025\/01\/Picture5-445x500.png 445w\" sizes=\"(max-width: 539px) 100vw, 539px\" \/><\/figure>","protected":false},"excerpt":{"rendered":"<p>Midachterbrug Aanbestedende dienst: provincie Gelderland Locatie: brug in de A348 over zijarm van de IJssel in de gemeente De Steeg, straat onder de brug is Havikerwaard. Wij hebben op 27 februari 2020 als onderaannemer van Bokalis aan de aanbesteding deelgenomen.&nbsp;Zij hebben dit werk gescoord op basis van hun plan van aanpak (PVA) waarbij het criterium [&hellip;]<\/p>\n","protected":false},"author":3,"featured_media":1732,"comment_status":"open","ping_status":"open","sticky":false,"template":"","format":"standard","meta":{"_seopress_titles_title":"","_seopress_titles_desc":"","_seopress_robots_index":"","_seopress_robots_follow":"","_seopress_robots_imageindex":"","_seopress_robots_snippet":"","_seopress_robots_primary_cat":"","_seopress_robots_breadcrumbs":"","_seopress_robots_freeze_modified_date":"","_seopress_robots_custom_modified_date":"","_seopress_robots_canonical":"","_seopress_social_fb_title":"","_seopress_social_fb_desc":"","_seopress_social_fb_img":"","_seopress_social_fb_img_attachment_id":0,"_seopress_social_fb_img_width":0,"_seopress_social_fb_img_height":0,"_seopress_social_twitter_title":"","_seopress_social_twitter_desc":"","_seopress_social_twitter_img":"","_seopress_social_twitter_img_attachment_id":0,"_seopress_social_twitter_img_width":0,"_seopress_social_twitter_img_height":0,"_seopress_redirections_value":"","_seopress_redirections_enabled":"","_seopress_redirections_enabled_regex":"","_seopress_redirections_logged_status":"","_seopress_redirections_param":"","_seopress_redirections_type":0,"_seopress_analysis_target_kw":"","_seopress_news_disabled":"","_seopress_video_disabled":"","_seopress_video":[],"_seopress_pro_schemas_manual":[],"_seopress_pro_rich_snippets_disable_all":"","_seopress_pro_rich_snippets_disable":[],"_seopress_pro_schemas":[],"iawp_total_views":16,"footnotes":""},"categories":[9,12],"tags":[],"locatie":[],"class_list":["post-2306","post","type-post","status-publish","format-standard","has-post-thumbnail","hentry","category-blog","category-industrialcoating"],"_links":{"self":[{"href":"https:\/\/www.iris.be\/en\/wp-json\/wp\/v2\/posts\/2306","targetHints":{"allow":["GET"]}}],"collection":[{"href":"https:\/\/www.iris.be\/en\/wp-json\/wp\/v2\/posts"}],"about":[{"href":"https:\/\/www.iris.be\/en\/wp-json\/wp\/v2\/types\/post"}],"author":[{"embeddable":true,"href":"https:\/\/www.iris.be\/en\/wp-json\/wp\/v2\/users\/3"}],"replies":[{"embeddable":true,"href":"https:\/\/www.iris.be\/en\/wp-json\/wp\/v2\/comments?post=2306"}],"version-history":[{"count":0,"href":"https:\/\/www.iris.be\/en\/wp-json\/wp\/v2\/posts\/2306\/revisions"}],"wp:featuredmedia":[{"embeddable":true,"href":"https:\/\/www.iris.be\/en\/wp-json\/wp\/v2\/media\/1732"}],"wp:attachment":[{"href":"https:\/\/www.iris.be\/en\/wp-json\/wp\/v2\/media?parent=2306"}],"wp:term":[{"taxonomy":"category","embeddable":true,"href":"https:\/\/www.iris.be\/en\/wp-json\/wp\/v2\/categories?post=2306"},{"taxonomy":"post_tag","embeddable":true,"href":"https:\/\/www.iris.be\/en\/wp-json\/wp\/v2\/tags?post=2306"},{"taxonomy":"locatie","embeddable":true,"href":"https:\/\/www.iris.be\/en\/wp-json\/wp\/v2\/locatie?post=2306"}],"curies":[{"name":"wp","href":"https:\/\/api.w.org\/{rel}","templated":true}]}}